Milestones

Year 1 | Year 2 Year 3 Year 4

Year 1

MS no. Milestone name                                                                                               WP Task Planned delivery date Actual delivery date Status Comments
MS1 Kick-off meeting WP1 1.1 M2      
MS2 Kick-off Meeting of ARIES-TIARA working-group WP1 1.3 M3      
MS22 EuroNNAC3 Kick-Off Meeting WP5 5.1 M3      
MS49 Organisation of WP-15 kick-off meeting WP15 15.1 M3      
MS3 Forming all official bodies required by the governance WP1 1.1 M6      
MS10 Project website launched WP2 2.2 M6      
MS50 First sample substrates cleaned at INFN for depositing at partners WP15 15.2 M6      
MS58 Organisation of PowerMat kick-off meeting WP17 17.1 M6      
MS63 Setup simulation framework for acceleration and radiation generation in wakefields driven by lasers with orbital angular momentum WP18 18.3 M6      
MS17 Contribute to Workshop on Energy for Sustainable Science WP4 4.1 M7      
MS33 First general workshop of the RULE network WP7 7.1 M9      
MS4 1st Annual Meeting WP1 1.1 M12      
MS11 Meeting to agree MOOC platform and academic structure and content of e-learning course WP2 2.4 M12      
MS13 Current applications of e-beam accelerators up to 10 MeV WP3 3.2 M12      
MS23 EAAC and Yearly Meeting EuroNNAc3 I WP5 5.4 M12      
MS26 Report on 1st Annual workshops of all tasks WP6 6.1 M12      
MS34 First topical meeting of the RULE network: injector WP7 7.2 M12      
MS39 Report on 1st Annual workshops of all tasks WP8 8.1 M12      
MS42 Appointing of an Industrial Advisory Board, (IAB) WP14 14.3 M12      
MS47 Reviewed requirements document WP14 14.6 M12      
MS64 Setup of experimental facilities for laser wakefield acceleration experiments using laser drivers with orbital angular momentum WP18 18.3 M12    

 

Year 2

MS no. Milestone name                                                                                               WP Task Planned delivery date Actual delivery date Status Comments
MS45 First HTS Short Length produce via new process WP14 14.5 M14      
MS51 First samples exchanged (system 1 and 2) and deposited at partners WP15 15.3 & 15.4 M14      
MS35 First topical meeting of the RULE network: technology WP7 7.3 M15      
MS14 New industrial applications of electron beams WP3 3.3 M18      
MS53 Conceptual layout of electron gun and power modulator completed WP16 16.3 M18      
MS18 Workshop on low loss superconducting RF WP4 4.2 M19      
MS48 Reviewed design and system configuration document, updated software WP14 14.6 M21      
MS5 Identification of mechanisms for sustainable collaborative R&D WP1 1.3 M24      
MS6 2nd Annual Meeting WP1 1.1 M24      
MS7 Mid-term Review WP1 1.1 M24      
MS12 Workshop on training activities in Europe in a global context WP2 2.3 M24      
MS15 Medical applications of high energy electron beams WP3 3.4 M24      
MS24 Yearly Meeting EuroNNAc3 II WP5 5.1 M24      
MS27 Report on 2nd Annual workshops of all tasks WP6 6.1 M24      
MS28 Parameter database for various ERL & Linac facilities WP6 6.5 M24      
MS36 Second topical meeting of the RULE network: injector WP7 7.2 M24      
MS40 Report on 2nd Annual workshops of all tasks WP8 8.1 M24      
MS43 1st academia-meets-industry event WP14 14.3 M24      
MS54 Design of test stand and beam diagnostics completed WP16 16.4 M24      
MS55 Conceptual design of integrated set-up completed WP16 16.2 M24      

Year 3

MS no. Milestone name                                                                                               WP Task Planned delivery date Actual delivery date Status Comments
MS52 First samples exchanged (system 3 and SIS) and deposited at partners WP15 15.3 & 15.4 M26      
MS37 Second topical meeting of the RULE network: technology WP7 7.3 M27      
MS56 Engineering design of electron gun and power modulator completed WP16 16.3 M27      
MS59 Irradiation campaigns at GSI for radiation hardness studies WP17 17.3 M27      
MS16 Study of different options for PET isotope production WP3 3.5 M30      
MS65 Final design of the ARIES dielectric structure for relativistic beams WP18 18.4 M30      
MS20 Workshop on efficient neutron targets and moderators WP4 4.3 M31      
MS25 EAAC and Yearly Meeting EuroNNAc3 III WP5 5.4 M32      
MS38 Second general workshop of the RULE network WP7 7.1 M33      
MS8 3rd Annual Meeting WP1 1.1 M36      
MS29 Report on 3rd Annual workshops of all tasks WP6 6.1 M36      
MS41 Report on 3rd Annual workshops of all tasks WP8 8.1 M36      
MS44 2nd academic-meets-industry event WP14 14.3 M36      
MS46 Characterization of first long length conductor WP14 14.5 M36      
MS60 Irradiation effects analysis WP17 17.3 M36      
MS66 Start of commissioning interstage line WP18 18.2 M36      

Year 4

MS no. Milestone name                                                                                               WP Task Planned delivery date Actual delivery date Status Comments
MS45 First HTS Short Length produce via new process WP14 14.5 M14      
MS21 Workshop on efficient magnets/beam transport WP4 4.5 M37      
MS30 Strategies for e-cloud mitigation in future accelerators WP6 6.4 M40      
MS31 Identification & prioritization of mitigation approaches WP6 6.2 M40      
MS61 Comparative compendium of materials developed WP17 17.2 M40      
MS57 Assembly of test stand with beam diagnostics completed WP16 16.4 M42      
MS32 Feasibility of an Open Data Infrastructure for accelerator reliability WP6 6.3 M44      
MS62 Dissemination of R&D results on novel materials for accelerator and societal applications WP17 17.5 M46      
MS9 4th Annual Meeting WP1 1.1 M48      