Deliverables

Year 1

Del no.

Deliverable name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

D14.1 Set-up of the Proof-of-Concept innovation-funding scheme WP14 14.2 M12 23/04/2018 Achieved Report
D15.1 Evaluation of cleaning process WP15 15.2 M12 28/06/2018 Achieved Report
D17.1 Material characterization WP17 17.2 M12 30/04/2018 Achieved Report

Year 2

Del no.

Deliverable name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

D18.1 Enabling multi-stage Laser Wakefield Acceleration (LWFA) WP18 18.2 M18 29/10/2018 Achieved Report
D7.1 First beam tests for low emittance rings WP7 7.1 M18 29/10/2018 Achieved Report
D14.2 Academia meets industry event 1 WP14 14.3 M24 09/05/2019 Achieved Report
D14.3 Production of material samples of carbon-based composites and metal-diamond composites WP14 14.4 M24 30/10.2018 Achieved Report
D15.2 Evaluation of systems 1 and 2 WP15 15.3 M24 30/04/2019 Achieved Report
D16.1 Electron beam dynamics studies WP16 16.2 M46 02/10/2021
Achieved
Report
D3.1 Applications of electron beams in the environmental area WP3 3.3 M24 02/04/2019 Achieved Report

Year 3

Del no.

Deliverable name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

D7.2 Final report on injection schemes and injector studies WP7 7.2 M27 03/06/2019 Achieved Report
D6.1 Ranking of performance degrading mechanisms for hadron storage rings and synchrotrons WP6 6.2 M28 23/10/2019 Achieved Report
D14.4 First long length industrial High Temperature Superconductor WP14 14.5 M30 31/10/2019 Achieved Report
D3.2 Evaluation of new technology for electron beam applications WP3 3.2 M30 07/11/2019 Achieved Report
D18.4 Dielectric structure WP18 18.4 M35 31/03/2020 Achieved Report
D4.1 Report on magnetic shielding for high quality superconducting resonators WP4 4.4 M35 06/04/2020 Achieved Report
D15.3 Evaluation of system 3 WP15 15.4 M36 15/06/2020 Achieved Report
D16.2 Manufacturing of electron gun and power modulator completed WP16 16.3 M46 16/03/2021 Achieved Report
D18.3 Exotic lasers and vortex light beams WP18 18.3 M36 26/06/2020 Achieved Report
D2.1 E-learning course WP2 2.4 M36 27/05/2020 Achieved Report
D3.3 Comparison of different accelerator options for 99mTc and therapeutic isotope production WP3 3.5 M36 22/06/2020 Achieved Report
D5.1 Specialized school on Novel Accelerators for young scientists WP5 5.5 M36 05/11/2019 Achieved Report
D6.2 Report on optimal RAMS characteristics for particle accelerators WP6 6.3 M36 20/12/2019 Achieved
Report
D6.3 Summary of novel methods to reduce accelerator impedance WP6 6.4 M36 27/05/2020 Achieved Report
D7.3 Final report on technology for low emittance rings WP7 7.3 M36 28/05/2020 Achieved Report

Year 4

Del no.

Deliverable name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

D2.2 Final report on coordination of communication/outreach activities WP2 2.2 M37 28/07/2020 Achieved Report
D2.3 Final report on coordination of training activities WP2 2.3 M39 30/09/2020 Achieved Report
D4.2 Design of an efficient klystron WP4 4.2 M47 26/03/2021 Achieved Report
D1.1 Final Report on European Strategy WP1 1.3 M48 22/07/2021 Achieved Report
D3.4 Design of a compact 140 MeV electron linear accelerator WP3 3.4 M42 01/12/2020 Achieved Report
D4.3 Report on pulsed magnets WP4 4.5 M43 09/12/2020 Achieved Report
D17.2 Irradiation effect simulations WP17 17.4 M50 29/06/2021 Achieved Access restricted
D6.4 Report on outstanding open questions and prioritized R&D guidelines for ERLs WP6 6.5 M44 14/01/2021 Achieved Report
D18.5 Pushing back the charge frontier WP18 18.5 M54 30/11/2021 Achieved Report
D14.5 Real-time Event Distribution Network brought to openly accessible “product grade level” WP14 14.6 M50 20/05/2021 Achieved Report
D15.4 Final report on thin film technology WP15 15.1 M48 21/04/2021 Achieved Report
D16.3 Tests of electron gun at test stand completed WP16 16.4 M53 30/06/2022 Achieved Report
D17.3 Irradiation test results WP17 17.3 M54 17/11/2021 Achieved Report
D18.2 LWFA inter-stage transport line completed and tested WP18 18.2 M54 02/12/2021 Achieved Report
D4.4 Report on the optimization procedure and technical layout of efficient moderator assemblies WP4 4.3 M46 26/03/2021 Achieved Report
D6.5 White list of ranked far-future accelerator options WP6 6.6 M46 12/04/2021 Achieved Report
D7.4 Final report on the Rings with Ultra-Low Emittance network WP7 7.4 M46 04/06/2021 Achieved Report
D8.1 Report on progress in beam diagnostics for hadron LINACs WP8 8.2 M54 20/12/2021 Achieved Report
D8.2 Report on advances in beam diagnostics for hadron synchrotrons WP8 8.3 M54 20/12/2021 Achieved Report
D8.3 Report on advances in beam diagnostics for 3rd generation light sources WP8 8.4 M54 20/12/2021 Achieved Report
D8.4 Report on advances in beam diagnostics for FELs WP8 8.5 M54 20/12/2021 Achieved Report
D5.2 Final EuroNNAc and EAAC Report WP5 5.1
5.2
5.3
M46 08/04/2021 Achieved Report
D9.1 Transnational Access to magnet testing facilities WP9 N/A M60 30/06/2022 Achieved Report
D10.1 Transnational Access to material testing facilities WP10 N/A M60 30/06/2022 Achieved Report
D11.1 Transnational Access to electron and proton beam testing facilities WP11 N/A M60 30/06/2022 Achieved Report
D12.1 Transnational Access to radio frequency testing facilities WP12 N/A M60 30/06/2022 Achieved Report
D13.1 Transnational Access to plasma beam testing facilities WP13 N/A M60 30/06/2022 Achieved Report